Projects
A SUPPLIER SPECIALIZING IN PROFESSIONAL CONSTRUCTION MACHINERY SOLUTIONS
Custom Euro V Crawler 90 Diesel Concrete Pump Powers Deep Drilling Project in Tel Aviv, Israel
Nov. 11, 2026
Share :
Project Spotlight: Custom Euro V Crawler 90 Diesel Concrete Pump Powers Deep Drilling Project in Tel Aviv, Israel
Category: Project Case Study / Deep Foundation & Drilling Infrastructure
Location: Tel Aviv, Israel
Equipment Model: Shengmao Custom 90 m³/h Crawler Diesel Concrete Pump
Core Features: Euro V (Stage V) Emission-Compliant Diesel Engine, Heavy-Duty Steel Crawler Chassis, High-Pressure Pumping System, Dual Hydraulic Circuits
Application: Continuous Concrete Piling & Drilling Grouting under Challenging Jobsite Terrain
Shengmao Machinery has successfully delivered, commissioned, and deployed a custom-engineered 90 m³/h Crawler-Mounted Diesel Concrete Pump for a major foundation drilling and piling project in Tel Aviv, Israel.
The client is a premier equipment distributor and service provider in the Middle East representing top-tier global construction machinery brands, including SANY and Zoomlion. Facing complex ground conditions and stringent environmental regulations, the client required a customized, rugged crawler pump powered by an engine compliant with strict Euro V emission standards. Shengmao’s engineering team delivered a tailored solution that seamlessly integrated a low-emission Euro V diesel power unit with a high-strength crawler undercarriage. The equipment has entered full operation on-site, delivering smooth, high-pressure concrete delivery for deep drilling operations.
1. Project Overview at a Glance
|
Key Parameter |
Project Specification |
|
Project Type |
Deep Foundation Piling & Rotary Drilling Construction |
|
Project Location |
Tel Aviv, Israel |
|
Selected Equipment |
Shengmao Custom 90 m³/h Crawler Diesel Concrete Pump |
|
Maximum Theoretical Output |
90 m³/h |
|
Emission Standard |
Euro V / Stage V Certified Low-Emission Engine |
|
Mobility / Chassis |
Heavy-Duty All-Terrain Crawler Undercarriage with Remote Control Maneuvering |
|
Pumping Mechanism |
High-Pressure S-Valve System with Dual-Circuit Hydraulic Integration |
|
Max. Aggregate Size |
≤ 40 mm (Crushed Stone / Gravel) |
|
Concrete Delivery Application |
Deep Foundation Drilling, Grouting & CFA Piling |
|
Operational Status |
100% Operational & Actively in Full Production |
2. Client Background & Project Demands
The client is a highly respected heavy machinery dealership and equipment solutions provider in Israel, managing authorized distribution and technical support for world-class equipment manufacturers such as SANY and Zoomlion. With an intimate understanding of international engineering standards, their technical evaluation criteria are exceptionally demanding.
The end-user required a high-capacity concrete pumping unit specifically configured for deep foundation drilling and continuous flight auger (CFA) piling across complex urban construction zones in Tel Aviv.
3. Key Project Requirements & Challenges:
Strict Euro V Environmental Compliance: Israel enforces advanced European environmental and emission standards. Equipment operating in metropolitan areas like Tel Aviv must be equipped with certified Euro V (Stage V) power systems featuring advanced exhaust aftertreatment (DOC + DPF + SCR).
Rugged Off-Road Mobility: Drilling jobsites are characterized by soft, unpaved, mud-heavy, and uneven ground conditions where standard truck-mounted or wheel-towed trailer pumps easily get bogged down. A heavy-duty crawler track was mandatory.
High-Pressure Continuous Output: Piling and drilling applications require continuous, non-pulsating high-pressure concrete flow to prevent cold joints or air pockets deep inside drilled shafts.
Dealer-Grade Engineering Rigor: Sourced by a tier-one machinery distributor, every hydraulic, structural, and electrical component had to meet top-tier global benchmark specifications.
4. Technical Solution & Key Highlights
1). Euro V Clean Diesel Power Unit
Powered by a certified Euro V water-cooled diesel engine with high-pressure common rail injection and turbocharged intercooling.
Integrated exhaust aftertreatment system ensures ultra-low particulate and nitrogen oxide emissions, fully compliant with Israeli urban jobsite regulations.
Optimized cooling pack with high-efficiency radiator ensures continuous high-load pumping in Middle Eastern summer ambient temperatures exceeding 40°C.
2). Heavy-Duty All-Terrain Crawler Chassis
Robust tracked undercarriage featuring high-torque hydraulic travel motors and planetary final drives.
Proportional wireless remote control allows the operator to steer and maneuver the pump across muddy, soft, and sloped terrain with millimeter precision from a safe working distance.
Hydraulic outriggers with multi-point leveling provide solid stability during high-pressure drilling concrete discharges.
3). High-Efficiency 90 m³/h Pumping System
Hard-chromed concrete delivery cylinders and wear-resistant alloy cutting rings/spectacle plates guarantee an extended operating lifespan.
Precision-engineered S-tube valve with high switching speed delivers smooth, uninterrupted concrete flow, eliminating blockages during high-viscosity piling pours.
Automated central lubrication system continuously protects critical wear points during long shifts.
4). Intelligent Smart-Control System
Integrated PLC control cabinet equipped with real-time pressure monitoring, engine diagnostics, oil temperature alarms, and anti-plugging auto-reverse logic.
Dual operational modes (wired control panel + industrial wireless remote) provide flexible and secure operation.
5. On-Site Deployment & Operation in Tel Aviv
Following maritime delivery to Israel, the crawler diesel concrete pump was immediately transported to the drilling jobsite in Tel Aviv:
Pre-Delivery Inspection & Site Setup: Technical teams verified fluid levels, hydraulic pressure calibrations, and Euro V electronic control diagnostics.
Crawling Mobility Verification: The machine successfully navigated soft gravel and unpaved drilling access roads, positioning itself directly beside the rotary drilling rigs without external towing assistance.
Piling Concrete Trial & Load Testing: Connected to high-pressure pipeline runs, the unit pumped high-slump foundation concrete steadily into continuous drilled shafts at rates matching the drilling cycle.
Local Operator Handover: On-site drilling crews were trained on remote control navigation, pumping speed adjustment, and routine cleaning procedures.
6. More pictures of this 90m3/h diesel concrete pump with crawler


Feel free to reach out for any queries. We would be happy to help!
View More